• Product

    Global company in GRP industry
    with cutting-edge facilities and leading technology

  • GRP(SMC)
    Sheet

  • GRP
    Water Tank

  • GRP
    Door

  • Bathroom
    Material

  • Construction Material
    (Bathroom)

  • House
    (Prefabricated)

Bathroom Ceiling

1. Characteristics of Bathroom Ceilings

  • GRPmaterials' semi-permanent duration
  • Perfect watertightness
  • Excellent insulation and heat resistance
  • 2. Bathroom Ceiling Products and Their Appearance

  • Name Product Size(mm) Appearance Color Note
    Length Height Flat Dome
    Access HoleSI-1750900 White
    SI-2,3,4,5 700900 White
    SI-2,3,4,5700900 White
    SI-6,7,8 450450 White
    Body SI-1 12601750 White
    SI-2 13002000 White
    SI-3 13001750 White
    SI-4 13501750 White
    SI-5 14501750 White
    SI-6 10001750 White
    SI-7 12001750 White
    SI-8 12002000 White
    Side700 7001750 White
    800 8001750 White
    900 9001750 White
    1000 10001750 White
    1200 12001750 White
    2000 12002000 White
    960 960900 White
  • SI-1 Bathroom Ceiling

    NameSize(mm)AppearanceColor
    Access Hole 750×900DomeWhite
    Body1260×1750DomeWhite

    SI-2 Bathroom Ceiling

    NameSize(mm)AppearanceColor
    Access Hole700×900Flat/DomeWhite
    Body1300×2000FlatWhite

    SI-3 Bathroom Ceiling

    NameSize(mm)AppearanceColor
    Access Hole700×900Flat/DomeWhite
    Body1300×1750FlatWhite

    SI-4 Bathroom Ceiling

    NameSize(mm)AppearanceColor
    Access Hole 700×900Flat/DomeWhite
    Body1350*1750FlatWhite

    SI-5 Bathroom Ceiling

    NameSize(mm)AppearanceColor
    Access Hole700×900Flat/DomeWhite
    Body1450X1750FlatWhite

    SI-6,7,8 Bathroom Ceiling

    NameSize(mm)AppearanceColor
    Access Hole450x450FlatWhite
    Body10171000×1750FlatWhite
    12171200×1750FlatWhite
    12201200×2000White

    Side Panel

    3. How to install

    • Take measurements of the site and check the size of the product.
    • Select where to install the ceiling body.
    • Fix panels with vise plier on the adjacent of the panels, and fix them with pieces, etc. at intervals of 30cm.
    • Check if there is any gap between installed ceiling and tiles, then finish with silicon acetic acid.