Partition Type Water Tank
- Water Tank Panel
- Watertightness, Drain Capability and Strength of Water Tank
- Reinforcement Structure
- Partition Type Water Tank
1. Special feature
-
Utilizing maximum capacity
- - In the basement or other confined areas, it is possible to eliminate unusable space,and utilize the maximum space, by installing apartition type tank.
-
Various uses
- - If partition type tanks are installed, one section can be used for drinkin gwater, and the other section for service water(Ex.fire fighting).
-
Easy Maintenance
- - It is convenient for maintenance, because two tanks can be installed as one unit.
-
Cost effectiveness
- - The cost and installation of 1 partition tank is cheaper than 2 separates tanks.
2. Partition Installation
3. Effect for Partition Water Tank System
- - If tanks for two different uses are needed in a confined area or boiler room, a 72㎥ partition type tank can be installed to use half for drinking water, and half for service water. If separate tanks are installed, however, you have to installed two tanks with a maximum of 30㎥, because you need to have 1 meter distance between tanks for maintenance and operating space.
4. Earthquake-Proof Skid Base System
- Height of water tank 2.5m.H, Height of water tank 4m, GRP sectional Panel, Putting water to 85% of water tank height, Earthquake-Proof Strength 5.0
Result of testing base frame (Safety 2.0)
-
Height Contents Bending Stress(kg/c㎡) Drooping((cm) 2.5mH Main
Skid
BaseLong
term1170 < 1600(Allowable value) ■ O.K 0.15 < 0.25(Allowable value) ■ O.K Short
term1340 < 2400(Allowable value) ■ O.K 0.17 < 0.33(Allowable value) ■ O.K Sub
Skid
BaseLong
term1590 < 1600(Allowable value) ■ O.K 0.21 < 0.25(Allowable value) ■ O.K Short
term1830 < 2400(Allowable value) ■ O.K 0.25 < 0.33(Allowable value) ■ O.K 4mH Main
Skid
BaseLong
term790 < 1600(Allowable value) ■ O.K 0.06 < 0.25(Allowable value) ■ O.K Short
term900 < 2400(Allowable value) ■ O.K 0.27 < 0.33(Allowable value) ■ O.K Sub
Skid
BaseLong
term1540 < 1600(Allowable value) ■ O.K 0.15 < 0.25(Allowable value) ■ O.K Short
term1750 < 2400(Allowable value) ■ O.K 0.17 < 0.33(Allowable value) ■ O.K
5. Wave Proof Panel for Earthquake-Proof
6. Installation Standard(Pad and Space)
Standard of Base Concrete PAD Installation and Space - For maintenance of GRP tank, it needs extra space at least 600mm from wall and 1,000mm from ceiling.